ANNA UNIVERSITY
B.E./ B.TECH.,
DEGREE EXAMINATIONS, NOVEMBER/ DECEMBER 2012
COMPUTER SCIENCE
ENGINEERING
SEVENTH SEMESTER
IT2032
/ IT'702 SOFTWARE TESTING
[Regulation
2008]
Part
A [10 X 2 = 20 Marks]
1. What is test
case? What are the information's it Contains?
2. Differentiate
Verification and Validation.
3. Write the two
basic testing strategies used to design test Cases.
4. State the
need for code functional testing in test Case design.
5. Write the
workable definition for a software unit and clmteîle it.
6. Define test
harness.
6. Define test
harness.
7. What is the
purpose of Test Transmitted report 10g?
8. Write the
Various approaches to cost sw
9. Write the
various approaches to cost sw '
9. Differentiate
between projects monitoring a r Ct. Controlling.
10. What is
software configuration management?
Part
B [5 X 16 = 80 Marks]
11. [a] [i]
Explain the various software testing principles.
[ii] Define Correctness reliability,
integrity, interoperability.
Or
[b] Define defects
Write the Various origins of defects.
[ii] Explain the concept of defects with
the coin problem.
12. [a] Explain
the concepts of equivalence Class partitioning and boundary Value analysis.
Or
[b]Explain the
various additional white box test design approaches.
13. [a] [i]Describe
the activities 0r tasks and responsibilities for developer 0r tester in
support of multilevel testing?
[ii] List the tasks that must be
performed by the developer or tester during the preparation
for unit testing.
Or
[b] [i]Write the importance of security
testing and what are the consequences of security
Breaches, also write the Various areas which
has to be focused on during security testing.
[ii] State the need for integration
testing in procedural code.
14. Explain the
components of test plan. (16)
[b] [i] write any four IEEE recommended
test related documents in detail.
[ii] Write the various technical skills
needed by a test specialist
15. [a] [i]
Explain the five stop-test criteria that are based quantitative approach.
[ii] Narrate
about the metrics or parameters to be consider for evaluating the software quality.
No comments:
Post a Comment